DKG & Associates – Commerical Roofing and Leak Specialists
DKG & ASSOCIATES, INC. ROOFING CONTACTOR
  • Why DKG
  • About Us
  • How We Work
  • What We Do
  • Repair & Maintenance
  • Portfolio
    • Milagro Middle School
    • Sandia Mountain Natural History Center (SMNHC)
    • Sierra Vista Primary School, Ruidoso, NM
    • Garrey Carruthers State Library: New Mexico
  • GSA/CES
  • Contact

Sandia Mountain Natural History Center (SMNHC)

  • DJI_0257
1 2 3 4 5 6 7
jquery image slider by WOWSlider.com v9.0

 

Building Owner: Albuquerque Public Schools
Architect: NCA Architects
General Contractor: Thompson Construction, Inc.
Completed: 10-25-2019

Project Size: 12,812 SF
Roofing Systems: Standing Seam Metal Roofing System – 12,812 SF

Overview: The SMNHC is a three-building, new construction project comprised of a museum, administrative offices, kitchen, rest rooms, classrooms, and multi-purpose building. The subcontractor awards were pre-qualification based and not necessarily, low bid.

Installation: The 22 ga. pre-finished metal roofs are double lock standing seam with a 16” width and 1 1/2” depth installed directly over a self-adhering underlayment and 6 inches of polyisocyanurate insulation (R-value- 34.8) over a 22 ga. structural metal deck. DKG roll formed the panels and fabricated all sheet metal trims, fascia and counter flashings. A snow retention system was installed to reduce the risk of sliding snow off of metal roofs. The Owner received a manufacturer’s 20 Year No Dollar Limit Labor and Material Warranty.

01

Why DKG

02

About Us

03

How We Work

04

What We Do

05

MAINTENANCE

06

Portfolio
    © 2025 DKG & Associates – Commerical Roofing and Leak Specialists
    ↑
    Designed by Studio Hill Design